Board Of Supervisors — Tuesday, March 25, 2025
This is the plain-text record. Open this meeting in the interactive archive for video timestamps, search and vote comparisons.
How to attend or watch
Meetings of the Lake County Board of Supervisors will be available for participation virtually via Zoom. Live video of all Board of Supervisors meetings is broadcast online, at: https://countyoflake.legistar.com/Calendar.aspx
To participate in real time, please join the Zoom Meeting, by clicking the link below at 9am: Join from a PC, Mac, iPad, iPhone or Android device: Please click this URL to join. https://lakecounty.zoom.us/j/86533544962?pwd=eFU3SWhhVlR4OGtqK1hPLzI0N2F0dz09 Passcode: 726865 Or One tap mobile: +16694449171,,86533544962#,,,,*726865# US +16699006833,,86533544962#,,,,*726865# US (San Jose) Or join by phone: Dial(for higher quality, dial a number based on your current location): US: +1 669 444 9171 or +1 669 900 6833 or +1 346 248 7799 or +1 719 359 4580 or +1 253 205 0468 or +1 253 215 8782 or +1 360 209 5623 or +1 386 347 5053 or +1 507 473 4847 or +1 564 217 2000 or +1 646 931 3860 or +1 689 278 1000 or +1 929 205 6099 or +1 301 715 8592 or +1 305 224 1968 or +1 309 205 3325 or +1 312 626 6799 Webinar ID: 865 3354 4962 Passcode: 726865 International numbers available: https://lakecounty.zoom.us/u/kcUkQmMtyj PLEASE NOTE: IF ALL BOARD MEMBERS ARE PRESENT IN PERSON, PUBLIC PARTICIPATION BY ZOOM IS FOR CONVENIENCE ONLY AND IS NOT REQUIRED BY LAW. IF THE ZOOM FEED IS LOST FOR ANY REASON, THE MEETING MAY BE PAUSED WHILE A FIX IS ATTEMPTED BUT THE MEETING MAY CONTINUE AT THE DISCRETION OF THE CHAIRPERSON.
To submit a written comment on any agenda item please visit: https://countyoflake.legistar.com/Calendar.aspx and click on the eComment feature linked to the meeting date. If a comment is submitted after the meeting begins, it may not be read during the meeting but will become a part of the record.
Thank you for your interest in this meeting.
To participate in real time, please join the Zoom Meeting, by clicking the link below at 9am: Join from a PC, Mac, iPad, iPhone or Android device: Please click this URL to join. https://lakecounty.zoom.us/j/86533544962?pwd=eFU3SWhhVlR4OGtqK1hPLzI0N2F0dz09 Passcode: 726865 Or One tap mobile: +16694449171,,86533544962#,,,,*726865# US +16699006833,,86533544962#,,,,*726865# US (San Jose) Or join by phone: Dial(for higher quality, dial a number based on your current location): US: +1 669 444 9171 or +1 669 900 6833 or +1 346 248 7799 or +1 719 359 4580 or +1 253 205 0468 or +1 253 215 8782 or +1 360 209 5623 or +1 386 347 5053 or +1 507 473 4847 or +1 564 217 2000 or +1 646 931 3860 or +1 689 278 1000 or +1 929 205 6099 or +1 301 715 8592 or +1 305 224 1968 or +1 309 205 3325 or +1 312 626 6799 Webinar ID: 865 3354 4962 Passcode: 726865 International numbers available: https://lakecounty.zoom.us/u/kcUkQmMtyj PLEASE NOTE: IF ALL BOARD MEMBERS ARE PRESENT IN PERSON, PUBLIC PARTICIPATION BY ZOOM IS FOR CONVENIENCE ONLY AND IS NOT REQUIRED BY LAW. IF THE ZOOM FEED IS LOST FOR ANY REASON, THE MEETING MAY BE PAUSED WHILE A FIX IS ATTEMPTED BUT THE MEETING MAY CONTINUE AT THE DISCRETION OF THE CHAIRPERSON.
To submit a written comment on any agenda item please visit: https://countyoflake.legistar.com/Calendar.aspx and click on the eComment feature linked to the meeting date. If a comment is submitted after the meeting begins, it may not be read during the meeting but will become a part of the record.
Thank you for your interest in this meeting.
1. Call to Order
2. Moment of Silence
3. Pledge of Allegiance
4. Consideration of Extra Items Not Appearing on the Posted Agenda
5. Approval of the Consent Agenda
5.1Adopt Resolution Amending Resolution No. 2024-99 to Amend the Adopted Budget for FY 2024-2025 by Appropriating Unanticipated Revenues and Add Appropriations in Budget Unit 2711 - Animal Medical Clinic
Action Item
passed on consent
Staff memo
Executive Summary
This item was approved by a 3 out of 5 vote on January 7th, 2025. It requires a 4 out of 5 vote and has been brought back for approval.
Lake County Animal Care and Control was awarded a $120,000 grant through the University of California Davis for funding to facilitate a low-cost spay and neuter program for the community. The grant is to assist Lake County Animal Care and Control in paying for a veterinarian salary and supplies for surgeries.
Recommended Action
Adopt Resolution Amending Resolution No. 2024-99 to Amend the Adopted Budget for FY 2024-2025 by Appropriating Unanticipated Revenues and Add Appropriations in Budget Unit 2711 - Animal Medical Clinic
5.2Approve Board of Supervisors Meeting Minutes March 4, 2025 and March 18, 2025
Action Item
passed on consent
5.3a) Approve Budget Transfer to Budget Unit 2603 - Code Enforcement for $500.00 from Inventory account 726.38-00 to Capital Asset account 726.62-72; and b) Amend the list of capital assets of the 2024-2025 budget to increase the Code Enforcement Vehicle to $39,906.70. and authorize the Chair of the Board to sign.
Action Item
passed on consent
Motion carried
Carried 4-0 — moved by Rasmussen
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Staff memo
Executive Summary
The budget transfer from 726.38-00, Inventory, to 726.62-72 Cap. FA-Equipment/Autos & Light Trucks, is necessary to pay the invoice for the Code Enforcement vehicle. Regarding purchasing considerations, this purchase falls under Section 2-38.4, as Community Development used Central Garage's contract/agreement with Freeway Toyota to purchase the vehicle.
Recommended Action
a) Approve Budget Transfer to Budget Unit 2603 - Code Enforcement for $500.00 from Inventory account 726.38-00 to Capital Asset account 726.62-72; and b) Amend the list of capital assets of the 2024-2025 budget to increase the Code Enforcement Vehicle to $39,906.70, and authorize the Chair to sign.
On motion of Supervisor Rasmussen, and by vote of the Board, approved consent agenda items 5.1 through 5.3. The motion carried by the following vote:
Ayes- Supervisors: 4 - Sabatier, Rasmussen, Pyska, and Crandell
Absent- Supervisor: 1 - Owen
6. Timed Items
6.19:02 A.M. - Public Input
Clerk’s notes: Margaux Kambara, County Surveyor Vance Ricks, Ana Santana, and Justin Quayle spoke.
6.29:03 A.M. - Pet of the Week
Presentation
Presentation Only.
Clerk’s notes: Animal Care and Control Shelter Administrator Sara Schram presented the pet of the week to the Board.
Chair Crandell asked if anyone present wished to speak. No one wished to speak and the public input portion of this item was closed.
6.39:06 A.M. - Consideration of Presentation of the Semi-Annual Employee Service Awards for the County of Lake
Ceremonial Item
Staff memo
Executive Summary
The Board of Supervisors presents the semi-annual Employee Service Awards for the County of Lake to recognize years of service.
Recommended Action
Ceremonial item only. No action to be taken.
Presentation Only.
Clerk’s notes: Human Resources Director Pam Samac introduced the item to the Board. Agricultural Commissioner Katherine Vanderwall, Auditor-Controller Jenavive Herington, Behavioral Health Director Elise Jones, Community Development Director Mireya Turner, Deputy Health Services Director Lisa Faraco, Information Technology Director Shane French, County Librarian Christopher Veach, Chief Probation Officer Wendy Mondfrans, Public Services Director Lars Ewing, County Surveyor Vance Ricks, Sheriff Lucas Bingham, Social Services Director Rachael Dillman-Parsons, Special Districts Administrator Robin Borre, UC Cooperative Extension Director Matthew Barnes, and Chair Crandell presented the item to the Board.
Chair Crandell asked if anyone present wished to speak. No one wished to speak and the public input portion of this item was closed.
6.49:30 A.M. - (Sitting as the Lake County Board of Housing Commission) Consideration of Presentation: Status of the Lake County Housing Commission
Action Item
Motion carried
Carried 4-0 — moved by Rasmussen
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Staff memo
Executive Summary
The Lake County Housing Commission (LCHC) will provide an update on the status of the LCHC and projections regarding operations if funding cuts occur.
We will discuss solutions and options for expanding housing services, including the development of affordable housing through Project Based Vouchers (PBV). Options we will discuss were explored with the U.S. Department of Housing and Urban Development (HUD), the Regional Housing Authority (RHA) of Sutter, Yuba, Colusa, and Nevada Counties, the Community Development Commission of Mendocino County, the Assistant County Administrative Officer (CAO), and the Deputy CAO of Housing. HUD and the Deputy CAO of Housing both recommend voluntary transfer/consolidation. LCHC lacks adequate diverse funding streams to survive any funding cuts. Transfer/consolidation is the process of combining Public Housing Authorities to improve efficiency, increase flexibility, and better serve communities, as outlined in PIH 2018-12. Transfer/consolidation with a larger housing authority will expand housing services and ensure a housing authority continues to serve Lake County.
Lastly, we will provide a recommendation that your Board, sitting as the Board of Housing Commissioners, direct staff to begin the application process to transfer the LCHA to the Regional Housing Authority (RHA) of Sutter, Yuba, Colusa, and Nevada Counties effective January 1, 2026. The RHA has indicated an interest in transfer/consolidation with LCHC. Transfer/consolidation with RHA will bring PBV housing development and the Family Self-Sufficiency (FSS) program to Lake County. The RHA is committed to having Lake County represented on the RHA Board of Commissioners and ensuring Lake County's vouchers serve Lake County's residents.
If your Board approves our recommendation, housing authorities are permitted to transfer/consolidate effective July 1st or January 1st and must provide 90 days advance notice to HUD. The process to transfer/consolidate will include a letter of commitment and a board resolution, which we would bring back to your board for approval. The same would be required of RHA. Then notification would be given to HUD. Additionally, we would return to provide recommendations to your board regarding the reassignment of non-Section 8 projects currently held by LCHC that cannot be transferred to RHA, including four (4) accounts LCHC holds that were transferred when the Rural Development Administration (RDA) disbanded (fund 938), and a portfolio for HOME CDBG (Home Investment Partnership Program Community Development Block Grant) loans.
Recommended Action
We respectfully request that your Board, sitting as the Board of Housing Commissioners, direct staff to begin the application process to transfer the LCHC to the Regional Housing Authority (RHA) of Sutter, Yuba, Colusa, and Nevada Counties effective January 1, 2026.
| Estimated Cost | 0 |
|---|
On motion of Commissioner Rasmussen, and by vote of the Board, sitting as the Board of Housing Commissioners, directed staff to begin the application process to transfer the LCHC to the Regional Housing Authority (RHA) of Sutter, Yuba, Colusa, and Nevada Counties effective January 1, 2026. The motion carried by the following vote:
Ayes- Commissioners: 4 - Sabatier, Rasmussen, Pyska, and Crandell
Absent- Commissioner: 1 - Owen
Clerk’s notes: Social Services Director Rachael Dillman-Parsons, Gustavo Becerra, Marco Cruz, and Deputy County Administrative Officer Lisa Judd presented the item to the Board.
Chair Crandell asked if anyone present wished to speak and the following people present in the Board of Supervisors Chambers spoke: Elaine Brown and Margaux Kambara. No one else wished to speak and the public input portion of this item was closed.
6.59:45 A.M. - (Sitting as the Lake County Board of Housing Commission) Consideration of the Lake County Housing Commission Housing Choice Voucher Program Administrative Plan for 2025 and signing of HUD Forms HUD-50077-CR and HUD-50077-SL
Action Item
Motion carried
Carried 4-0 — moved by Rasmussen
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Staff memo
Executive Summary
On February 24, 2025, the Lake County Housing Commission held a Public Hearing to review the proposed Housing Choice Voucher Program Administrative Plan for 2025. Attendees at the Public Hearing included two members of the Resident Advisory Board, two LCHC Housing Commissioners, a member of the public, and LCHC Staff. During the 45-day public comment period that preceded this hearing, the LCHC did not receive any public comment regarding the proposed Administrative Plan. During the hearing, staff gave a presentation detailing the proposed changes to the Administrative Plan from 2024 to 2025. There were no recommended revisions to the proposed Administrative plan, and it is ready to be submitted to HUD as written.
In addition to Board approval of these Plans, the LCHC is requesting the Chair of the Board of Housing Commissioners sign the Annual Civil Rights Certification (HUD Form HUD-50077-CR) as well as the Certification by State or Local Official of PHA Plans Consistency with the Consolidated Plan or State Consolidated Plan (HUD Form HUD-50077-SL) as required by HUD each year.
Included with this memo are HUD Forms HUD-50077-CR and HUD-50077-SL.
An electronic copy of the draft plan is available under the Related Documents section of the following webpage: https://www.lakecountyca.gov/811/Housing-Choice-Voucher-Program .
Recommended Action
We respectfully request that the Board, sitting as the Board of Housing Commissioners, approve the Housing Choice Voucher Program Administrative Plan for 2025 and sign HUD Forms HUD-50077-CR and HUD-50077-SL, and authorize the Chair to sign. Once these items are approved and signed by the Board, they will be electronically submitted to HUD before the April 17, 2025, deadline.
| Estimated Cost | 0 |
|---|
On motion of Commissioner Rasmussen, and by vote of the Board, approved Housing Choice Voucher Program Administrative Plan for 2025 and signing of HUD Forms HUD-50077-CR and HUD-50077-SL. The motion carried by the following vote:
Ayes- Commissioners: 4 - Sabatier, Rasmussen, Pyska, and Crandell
Absent- Commissioner: 1 - Owen
Clerk’s notes: Housing Program Coordinator Teresa Wold presented the item to the Board.
Chair Crandell asked if anyone present wished to speak. No one wished to speak and the public input portion of this item was closed.
6.610:00 A.M. - PUBLIC HEARING - Consideration of Appeal (AB 24-05) of Planning Commission’s Denial of Major Use Permit (UP 20-14), Nina Star Farms, LLC/ Nevelina Bogdanova, applicant and appellant; location: 23180 Shady Grove Road, Middletown (APN 004-006-16)
Public Hearing
Motion carried
Carried 4-0 — moved by Rasmussen
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Staff memo
TO: Board of Supervisors
FROM: Mireya Turner, Community Development Director
Mary Claybon, Senior Planner
DATE: March 25, 2025
SUBJECT: 10:00 A.M. - Consideration of Appeal (AB 24-05) of Planning Commission's Denial of Major Use Permit (UP 20-14), Nina Star Farms, LLC/ Nevelina Bogdanova, applicant and appellant; location: 23180 Shady Grove Road, Middletown (APN 004-006-16)
Exhibits
A. Staff Report from the December 12, 2024, Planning Commission hearing with the following attachments:
1. Project Site Plans (7/2023)
2. Draft Conditions of Approval
3. Property Management Plan (8/2023)
4. Initial Study/Mitigated Negative Declaration (8/6/2024)
5. Hydrology Report (9/6/2021)
6. Drought Management Plan (9/6/2021)
7. Biological Assessments (2/2/2020, 10/8/2024)
8. Electrical Load Calculations (8/4/2023)
9. Agency Comment
10. Tribal Comment
11. Public Comment
B. Planning Commission Minutes from December 12, 2024, Public Hearing
C. Appeal Application (AB 24-05)
I. EXECUTIVE SUMMARY
On December 12, 2024, the Lake County Planning Commission denied a Major Use Permit (UP 20-14) request for commercial cannabis cultivation consisting of two (2) A-Type 3B licenses for 37,446 square feet (sf) of mixed-light canopy within a 48,529 sf cultivation area and an A-Type 13 Distributor, Self-Distribution, transport only license.
At the December 12 hearing, the Planning Commission noted issues related to siting of the proposed project and expressed the position that the project did not fit the character of the neighborhood; the Planning Commission denied the project on a 4-0 vote, with one commissioner absent. The Planning Commission staff report and associated attachments are included as Exhibit A; the minutes of the meeting are included as Exhibit B. The meeting may be viewed online at: Planning Commission on 2024-12-12 9:00 AM -
In accordance with the Lake County Code, Zoning Ordinance Article 58, Section 21-58 subsection 58.31, the applicant filed an appeal (AB 24-01) of the Planning Commission's decision on December 18, 2024. The appeal application is included in Exhibit C.
There was no new information presented at the Planning Commission hearing that identified inconsistencies between the project (as conditioned) and the County Code, or information resulting in Staff being unable to make the findings required for a major use permit. As such, Staff's original recommendation for approval of the project remains. Staff recommend the Board of Supervisors uphold the appeal (AB 24-05), reversing the Planning Commission's denial of the project and approve Initial Study (IS 20-16) and Use Permit (UP 20-14).
II. PROJECT SUMMARY
Setting. The site is accessed via dirt and gravel driveway that branches to the east of Shady Grove Road, parallel to State Highway 29 in Middletown. Public Resource Codes (PRC) Sections 4290 and 4291 for Road Standards shall be applied to this project due to the permanent structures in which cultivation activities would occur. Internal gates and roadways are designed to meet CALFIRE requirements including adequate road standards and width requirements for fire equipment access and a turnaround for emergency vehicles. For the purpose of establishing minimum wildfire protection standards in conjunction with building, construction and development in the State Responsibility Area, the roadway will include widening from the existing 14' to 20' of unobstructed horizontal clearance with a grading permit following approval of the major use permit and installing turnouts for emergency vehicle access. In addition, signage and building numbering; private water supply reserves for emergency fire use utilizing steel/fiberglass/or concrete water storage; and 100' of defensible space around structures are required.
Proposed Project. The applicant has indicated that construction would occur over a five-week period. Construction would require grading of the roadway, installation of identified parking spaces, and preparation of cultivation-related structures. All construction activities, including engine warm-up, will occur from 9:00 a.m. to 6:00 p.m. Monday through Saturday and shall adhere to all noise requirements in adherence to the Lake County Code. Additionally, all equipment will be maintained and operated to all federal, state, and local agency requirements to minimize spillage or leakage of hazardous materials. During construction, no vehicles will be left idling. Vehicles will only be parked on existing roadways/driveways or in previously disturbed areas. Water from the approved onsite well will be used to mitigate the generation of dust during development with a water truck.
Proposed uses include 37,446 sf of mixed-light canopy, within a total of eight greenhouses. Specifically, the greenhouses will consist of five (5) structures measuring 90' x 60', one (1) structure measuring 90' x 104', and one (1) structure measuring 30' x 104'. Additionally, immature plant propagation will be carried out in one (1) greenhouse measuring 103' x 30'. The greenhouses will be constructed using galvanized steel frames, covered with 6-millimeter polyethylene film for blackout purposes. Artificial lighting for the mixed-light cultivation will be implemented at a maximum intensity of 25 watts per square foot. The proposed greenhouses will be equipped with a black plastic film to ensure that light does not escape during the use of artificial lighting. The location of the ancillary buildings adheres to the setbacks of Scenic Combining District as identified by the project's site plans (Exhibit A1)
Cultivation operations will utilize water sourced from existing groundwater well, which has a capacity of 16 gallons per minute. To ensure efficient use of water resources, a drip irrigation system is proposed. The applicant has provided a Hydrological Analysis (Exhibit A5) and a Drought Management Plan (Exhibit 6) outlining water conservation strategies in the event of a declared drought emergency. There are two (2) agricultural ponds and two (2) existing stream crossings on-site. One stream crossing is a metal span bridge across Saint Helena Creek that is not proposed as an access point for the project. The other water crossing is a triple-barrel corrugated metal culvert crossing for the Class II watercourse. The culvert appears stable but likely does not meet current design specifications for withstanding 100-year floods and will need to be replaced in alignment with a California Department of Fish and Wildlife (CDFW) Lake Streambed Alteration Agreement (LSAA). Cultivation activities will occur in a relatively flat section of the parcel, which is situated within flood zones X and AE. Certain areas of the site located in the AE flood zone, as illustrated in Figure 3 below, will necessitate elevation certificates at the building permit stage of development.
Mixed light cultivation includes artificial lighting of up to 25 watts per square foot of canopy area. The Electrical Load Calculations prepared by DTN Engineering, dated August 3, 2023, identifies the project would utilize 3,300 amps. All electricity needed for the project will be supplied by the existing PG&E connection. According to the Property Management Plan, Nina Star Farms will require an electrical upgrade on the property. The electrical upgrade is to be applied for along with building permits for the processing facility and greenhouses after approval of the major use permit. The project is proposing a backup generator to be used in emergency situations when electricity cannot be supplied by PG&E. The proposed use would not include wasteful, inefficient, or unnecessary consumption of energy resources during Project development or operation. All energy usage shall adhere to all Federal, State, and local agency requirements regarding energy use.
Immature plants will be sourced from a permitted off-site nursery or propagated on-site in the immature plant mixed-light greenhouse. Distribution activities for self-transport will be carried out from the processing facility and will consist of up to one delivery or pickup per day. Subsequently, the cannabis will be transported and transferred to a licensed distribution facility.
FIGURE 1 - VICINITY MAP
FIGURE 2 - SITE PLANS
Environmental Review. Notification of the Project was sent to the following Tribes: Big Valley Rancheria, Cortina Rancheria, Elem Colony, Hopland Band of Pomo Indians, Koi Nation, Mishewal-Wappo, Middletown Rancheria, Redwood Valley Rancheria, Robinson Rancheria, Scotts Valley Band of Pomo Indians, Habematolel Pomo of Upper Lake Tribe, and Yocha Dehe Wintun Nation on February 18, 2020. On February 19, 2020, Middletown Rancheria responded stating the project is located within the aboriginal territory of Tribe. The Middletown Rancheria Tribal Historic Preservation Department stated they are, "okay with the project moving forward under the mutual understanding that the Tribe is contacted should there be any significant inadvertent discoveries." On August 10, 2022, Yocha Dehe Wintun Nation sent comments deferring to Middletown Rancheria. Tribal Consultation was not requested. Tribal Comments are Exhibit A10 to the Planning Commission Staff Report.
The California Environmental Quality Act (CEQA) requires agencies to evaluate the environmental implications of land use actions. A Draft Initial Study and Mitigated Negative Declaration (Exhibit A 4 of the Planning Commission Staff Report in Exhibit A) was prepared and circulated for public review in compliance with CEQA from 11/29/2023 to 12/28/2023. The Initial Study found all impacts to be less than significant with implementation of mitigation measures related to Aesthetics, Air Quality, Biological Resources, Cultural/Tribal Resources, Geology/Soils and Noise, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Tribal Cultural Resources, Utilities and Services, and Wildfire.
III. BASIS FOR THE DENIAL
Although the Planning Commission did not refute the fact that the proposed project meets all of the codified siting requirements within the Lake County Zoning Ordinance and State cannabis regulations, the Planning Commission noted a number of issues related to siting of the proposed project. Issues raised were not formalized within the motion for denial, but Staff summarizes the main points raised by the Planning Commission below.
1. Location is not consistent with the neighborhood character along State Highway 29 at Shady Grove Road
2. Impacts to St. Helena Creek
3. Potential Code Enforcement issues on separate parcel (held under identical ownership)
IV. APPEAL ANALYSIS
Per Lake County Zoning Ordinance Section 58.31, decisions of the Planning Commission may be appealed by an interested party within seven (7) calendar days of the decision and shall be accompanied by a written statement setting forth the grounds upon which the appellant asserts there was an error or abuse of discretion by the Planning Commission.
In this case, the appeal (AB 24-05) of December 12, 2024, Planning Commission decision was filed by the applicant in a timely manner on December 18, 2024. The applicant/appellant states, "...Planning Commission Decision based on false and defamatory statements made by individuals from the public, rather than the substantial evidence provided..." as the reason for the appeal. The appeal application (AB 24-05) is included in Exhibit C. Staff's response to each of the issues raised by the Planning Commission is provided below.
1. Location is not consistent with the neighborhood character along Highway 29 at Shady Grove Road
Staff Response: Under Article 27.13(at), commercial cannabis cultivation is allowable upon obtaining a major use permit under a zoning designation for Rural Lands and Agriculture. Cannabis cultivation is allowed in certain areas within Lake County upon issuance of a major or minor use permit depending on the project's size and characteristics of the site. The cultivation of cannabis is similar to an agricultural use and would take place on the property. The addition of eight greenhouses, a processing facility, a storage shed, four 5,000-gallon water storage tanks, and 6'10" perimeter fencing would support the use and is not considered a conversion of the land.
The applicant meets all development standards under Article 5 with further restrictions under Article 27.13(at) regarding minimum setback requirements. In this case, the property is located on a property with base zoning of Rural Lands - Agriculture - Floodway Fringe Combining - Floodway Combining - Scenic Combining - Waterway Combining. The property is not located within an Exclusion Area and is in an area that is characterized by agricultural uses, animal grazing and rural residential development.
The project has been strategically developed to ensure that the ancillary structures for cannabis cultivation are situated outside of the Scenic Corridor within the Scenic Combing District. In alignment with this requirement, a setback of 500 feet from the roadway has been established. The project meets all setbacks and development standards related to compatible uses. Therefore, the project would not be considered a non-compatible use.
2. Impacts to St. Helena Creek
Staff Response: The County Code requires a 150-foot setback from Class I water courses and a 100-foot setback from Class II and III watercourses. The Biological Assessment by Pinecrest Engineering (2/2/2020) states there are several unnamed and one named watercourse on site. A Class I perennial reach of St. Helena Creek and riparian corridor divides the parcel, flowing north through the middle of the property. The riparian corridor is well developed and stable. The unnamed seasonal Class II watercourse flows north through the western part of the parcel. Several Class III watercourses are also identified. On the western portion of the parcel there are two existing stock ponds that are connected by a vegetative swale. There is some wetland vegetation surrounding the stock ponds and swale.
One hundred foot setbacks have been identified in the site plans (Exhibit A1). Activities are largely proposed to be limited to existing disturbed areas and will observe all required setbacks from jurisdictional watercourses. There are no vernal pools or serpentine outcrops that possess a high likelihood of containing special-status plant species in the proposed cultivation areas. While the bridge crossing on Saint Helena Creek provides access to the eastern side of the parcel, the project is accessed via Shady Grove Road and not accessed by the bridge.
3. Potential Code Enforcement issues on separate parcel (held under identical ownership)
Staff Response: Land use is site-specific. Code Enforcement records for this site have been addressed. Concerns brought forward by neighbors were for an adjacent parcel, not the project parcel. Neighbors stated California Department of Fish and Wildlife (CDFW) had investigated the site, however no documentation has been provided to support the claim. Additionally, CDFW was notified of this project during Agency Review and no adverse commentary was received. The project was applied for on February 5, 2020. Staff visited the site on December 15, 2023. At that time several items for demolition and site cleanup were identified. The Planning Division and Build Safety Division staff worked closely with the applicant and project consultant for a demolition permit identified as BLD24-00488 for removal of an out-of-service hot tub, proper removal of electrical installation serving the hot tub, removal of two trailers by a waste hauling company, and clearing of garbage and rubbish. The building permit was finaled by a Building Safety Division Building Inspector on July 15, 2024, following verification of site maintenance. Please refer to figures within the December 12, 2024, Planning Commission Staff Report.
Conclusion. Community Development Department staff must analyze projects for conformance with existing Lake County Code requirements and regulations. As summarized above and discussed in detail throughout the December 12, 2024, Planning Commission Staff Report (and associated documents), the project meets all required regulations related to development and siting, and is also consistent with the Lake County General Plan and Middletown Area Plan. Staff recommends the Board of Supervisors uphold the appeal, reversing the Planning Commission's denial of the project, and approve Use Permit (UP 20-14) and Initial Study (IS 20-16). Findings for approval are provided below, and conditions of approval are included in Exhibit A2.
V. MAJOR USE PERMIT FINDINGS FOR APPROVAL
The Review Authority shall only approve or conditionally approve a Major Use Permit (LCZO Section 51.4, Major Use Permits) if all of the following findings are made:
1. That the establishment, maintenance, or operation of the use applied for will not under the circumstances of the particular case, be detrimental to the health, safety, morals, comfort and general welfare of the persons residing or working in the neighborhood of such proposed use or be detrimental to property and improvements in the neighborhood or the general welfare of the County.
Commercial cannabis cultivation is a permitted use in the "AG" Agricultural and "RL" Rural Lands zoning upon issuance of a Major Use Permit pursuant to Article 27, Sec. 21-27, Sec. 27.11 Table B of the Lake County Zoning Ordinance. The project scope complies with the minimum regulatory requirements set by the local ordinances to address the health, safety, morals, comforts, and general welfare of those working or residing near the proposed use. Prior to constructing any type of structure(s), the applicant shall obtain the necessary permits and licenses from the appropriate federal, state, and/or local government agencies. Additionally, the CDD would conduct annual compliance monitoring inspections during the cultivation season to ensure compliance with the County's ordinances, the approved Property Management Plan, mitigation measures, and conditions of approval.
2. That the site for the project is adequate in size, shape, location, and physical characteristics to accommodate the type of use and level of development proposed.
The proposal includes 37,446 sf of outdoor canopy area located within 48,529 sf cultivation area. The location and size of the project site comply with the local ordinance requirements for use and setbacks. The Lake County Zoning Ordinance allows type 1, 2, 3, and 4 cultivation operations on Agricultural- and Rural Lands-zoned land, and the subject parcel is approximately 44 acres in size, large enough to enable the cultivation area proposed.
3. That the streets, highways and pedestrian facilities are reasonably adequate to safely accommodate the specific proposed use.
The site is served by a private driveway which is accessed off Shady Grove Road. Additionally, per the Public Resource Codes (PRC) Sections 4290 and 4291 Road Standards, the project will need to meet the CALFIRE road standards. The applicant must comply with Lake County Code, Ch. 22 and California Building Code prior to construction of any structures. Therefore, the project has adequate access to accommodate the specific use and will be required to maintain and improve the access to be compliant with PRC 4290 and 4291.
4. That there are adequate public or private services, including but not limited to fire protection, water supply, sewage disposal, and police protection to serve the project.
The project site will utilize onsite groundwater well. Additionally, the project parcel has adequate emergency service protection through the Lake County Sheriff's Office, and the Lake County Protection District. The applicant is required to adhere to all applicable local, state, and federal regulations, mitigation measures, and conditions of approval intended to ensure adequate services and maintain safety at the site. This application was routed to all of the affected public and private service providers (including Special Districts, Environmental Health, PG&E, and all area Tribal Agencies), and there are adequate public utilities and services available to the site.
5. That the project is in conformance with the applicable provisions and policies of this Code, the General Plan and any approved zoning or land use plan.
The cultivation of commercial cannabis is a permitted use within the Agricultural and Rural Lands zoning district upon securing a Major Use Permit according to Article 27 of the Lake County Zoning Ordinance. Additionally, the Lake County General Plan does not have any provisions specifically for commercial cannabis, but both the General Plan and the Middletown Area Plan have provisions for economic development, water resources, agricultural resources, and land use compatibility. Additionally, the subject property complies with the minimum setbacks and development standards.
6. That no violation of Chapters 5, 17, 21, 23 or 26 of the Lake County Code currently exists on the property, unless the purpose of the permit is to correct the violation, or the permit relates to a portion of the property which is sufficiently separate and apart from the portion of the property in violation so as not to be affected by the violation from a public health, safety or general welfare basis.
There are no violations of Chapters 5, 7, 34, 35, 36, or 37 of the Lake County Code on this property. The project was applied for on February 5, 2020. Staff visited the site on December 15, 2023. At that time several items for demolition and site cleanup were identified. The Planning Division and Build Safety Division staff worked closely with the applicant and project consultant for a demolition permit (BLD24-00488) for removal of an out of service above ground hot tub, proper removal of electrical installation serving the hot tub, removal of trailer structures by a waste hauling company, and clearing of garbage and rubbish. No violations of the County Code exist on site.
7. The proposed use complies with all development standards described in Chapter 21, Article 27, Section 1.i.
The proposed use complies with all development standards described in Chapter 21, Article 27, Section 1.i, including minimum lot size, setbacks from property lines and off-site residences, and fence height.
8. The applicant is qualified to make the application described in Chapter 21, Article 27, Section 1.ii.(g).
The applicant is qualified to make the application described in Chapter 21, Article 27, Section 1.ii.(g), as the applicant complies with background clearance requirements.
9. The application complies with the qualifications for a permit described in Chapter 21, Article 27, Section 1.ii.(i).
The application documentation complies with the qualifications for a permit described in Chapter 21, Article 27, Section 1.ii.(i).
VI. RECOMMENDATION
Staff recommends that the Board of Supervisors:
Approve the Appeal (AB 24-05), overturning the Planning Commission's denial of Major Use Permit (UP 20-14) and approve Initial Study (IS 20-16), subject to the findings in the Memorandum dated March 25, 2025, and Conditions of Approval in Exhibit A2.
Sample Motions:
Initial Study (IS 20-16) Approval
I move that the Board of Supervisors find that the proposed Major Use Permit (UP 20-14) for Nina Star Farms (Nina Star LLC) for the property located at 23180 Shady Grove Road, Middletown, APN: 014-006-16 would not have a significant impact on the environment and adopt Mitigated Negative Declaration (IS 20-16), determining that all impacts can be mitigated to 'less than significant' through the implementation of the mitigation measures within the Mitigated Negative Declaration (IS 20-16), subject to the findings in the Memorandum dated March 25, 2025, and Conditions of Approval in Exhibit A2.
Appeal Approval (AB 24-05)
I move that the Board of Supervisors approve Appeal AB 24-05, in concept, and direct Staff to prepare Draft Findings of Fact.
On motion of Supervisor Rasmussen, and by vote of the Board, continued the item to April 1, 2025 at 10:00 a.m. The motion carried by the following vote:
Ayes- Supervisors: 4 - Sabatier, Rasmussen, Pyska, and Crandell
Absent- Supervisor: 1 - Owen
Clerk’s notes: Chair Crandell introduced the item to the Board.
Chair Crandell asked if anyone present wished to speak and the following person present in the Board of Supervisors Chambers spoke: Jamie Prisco. The following person spoke via Zoom: Justin Eballar. No one else wished to speak and the public input portion of this item was closed.
A 12.12.24 PC Staff Report A1 - Site Plan and Renderings A2 - Draft Conditions of Approval A3 - Farm Management Plan A4 - Initial Study A5- Hydrology Report A6- Drought Management Plan A7 - Biological Assessments A8 - Nina Star Electrical Load Calculations A9 - Agency Comment A10 - Tribal Comment B 12-12-2024 PC MINUTES C Application A11 - Public Comment Public Comment_Linda Miller Public Comment
6.711:00 A.M. - Consideration of Update on Drought Water Shortage Task Force and Drought Resilience Plan Advisory Committee Membership and Activities
Report
Staff memo
Executive Summary
Staff will present an update on the membership of the Advisory Committee and projected timeline for Drought Resilience Plan development.
Recommended Action
No Board action needed.
Presentation Only.
Clerk’s notes: Community Development Director Mireya Turner presented the item to the Board. Water Resources Director Pawan Upadhyay and Stantec Representative Bridget Lowry spoke.
Chair Crandell asked if anyone present wished to speak and the following person spoke via Zoom: Betsy Cawn. No one else wished to speak and the public input portion of this item was closed.
6.81:00 P.M. - (Sitting as the Board of Directors Lake County Watershed Protection District ) Consideration to: a) Waive County Code Chapter 2 Sec. 2-38.2(2) due to the unique nature of services and b) Award Clear Lake LG Sonic Buoy Harmful Algal Bloom Mitigation Project in the amount of $921,407.12 and Authorize the Chair to Sign and the Water Resources Director to execute the Contract between the Watershed Protection District and LG Sonic
Agreement
Motion carried · 2 motions
Carried 4-0 — moved by Sabatier
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Carried 4-0 — moved by Sabatier
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Staff memo
Executive Summary
The Clear Lake LG Sonic Buoy Harmful Algal Bloom Mitigation Project is designed to reduce the harmful impacts of blue-green algae and cyanobacteria while lowering processing costs for LMI drinking water purveyors. Clear Lake, one of the oldest lakes in North America, faces annual contamination from harmful algal blooms (HABs), fueled by phosphorus, nitrogen, and rising temperatures. With 60% of Lake County relying on Clear Lake for drinking water, addressing HABs is a priority.
This 24-month project involves the purchase, installation, and operation of 14 algae mitigation buoys from LG Sonic, incorporating Interactive Algae Control (IAC) software. The system utilizes ultrasonic waves to inhibit algae growth by reducing buoyancy and nutrient access, preventing toxic blooms without harming aquatic life. The Lake County Water Resources Department will oversee implementation and long-term maintenance in partnership with LG Sonic.
Grant funding for the project was made available in 2024, and due to the unique nature of the technology, the project qualifies as a sole-source procurement based on the original LG Sonic proposal. The project will be funded through Budget Unit 8109 and reimbursed by 1120. The anticipated construction cost was $1,000,000, with LG Sonic deploying 10 MPC Buoy Lite units and 4 MPC Buoy Pro units, along with staff training, for a contracted cost of $921,407.2 with $60,000 to cover staff time for a total amount of $981,407.12.
Recommended Action
A) Waive County Code Chapter 2 Sec. 2-38.2(2) due to the unique nature of services.
B) Award Clear Lake LG Sonic Buoy Harmful Algal Bloom Mitigation Project in the amount of $921,407.20 and Authorize the Chair to Sign and the Water Resources Director to execute the Contract between the Watershed Protection District and LG Sonic.
On motion of Supervisor Sabatier, and by vote of the Board, Waived County Code Chapter 2 Sec. 2-38.2(2) due to the unique nature of services. The motion carried by the following vote:
Ayes- Supervisors: 4 - Sabatier, Rasmussen, Pyska, and Crandell
Absent- Supervisor: 1 - Owen
On motion of Supervisor Sabatier, and by vote of the Board, approved Contract Award to Clear Lake LG Sonic Buoy Harmful Algal Bloom Mitigation Project in the amount of $921,407.12 between the Watershed Protection District and LG Sonic contingent upon obtaining any applicable environmental reviews and approvals in accordance with Exhibit A of the contract and directed staff to collaborate with the Sheriff's Office Marine Patrol and City of Clearlake for logistical input and authorized the chair to sign. The motion carried by the following vote:
Ayes- Supervisors: 4 - Sabatier, Rasmussen, Pyska, and Crandell
Absent- Supervisor: 1 - Owen
Clerk’s notes: Water Resources Director Pawan Upadhyay presented the item to the Board. Community Development Director Mireya Turner, LG Sonic Representative E.J. Neafsey, Sheriff Lucas Bingham, County Administrative Officer Susan Parker, and County Counsel Lloyd Guintivano spoke.
Chair Crandell asked if anyone present wished to speak and the following people present in the Board of Supervisors Chambers spoke: Clearlake City Manager Alan Flora and Clearlake Mayor Russ Cremer. The following person spoke via Zoom: Betsy Cawn. No one else wished to speak and the public input portion of this item was closed.
6.91:30 P.M. - Consideration of a) Update on Golden Mussel Prevention Programming; b) Approval of funding request to support Fiscal Year 2024-25 Golden Mussel prevention activities for Lake County in the amount of $25,000
Presentation
Motion carried
Carried 4-0 — moved by Rasmussen
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Staff memo
Executive Summary
On October 17, 2024 the California Department of Water Resources (DWR) reported finding attached, adult invasive Golden Mussels (Limnoperna fortunei) at a sample site location in the Port of Stockton. Mussel specimens were sent to UC Davis Genomic Variation Laboratory and confirmed to be Golden Mussels, originally from China; the species had not previously been detected in North America.
County of Lake and Regional water body managers are highly concerned about the spread of Golden Mussels (Limnoperna fortunei), which have been detected throughout the Sacramento Delta within the last 6 months. While similar in appearance, biology, and potential ecosystem effects to Quagga and Zebra Mussels (the current focus of invasive mussel prevention programs in Lake County), Golden Mussels pose a greater threat due to their rapid recolonization rate as adults and wider tolerance of preferred substrates.
On December 10, 2024, staff from the Water Resources Department (WRD) presented on the heightened threat of Golden Mussels to Clear Lake and other Lake County water bodies and proposed several prevention strategies and measures. This presentation will refine information earlier presented. Staff are additionally seeking your approval to fund Golden Mussel prevention planning and response to protect Lake County waterbodies (today's request is limited to funding for the remainder of Fiscal Year, FY, 2024-25):
1) WRD will present current updates on the golden mussel and updates to the current Lake County prevention program as response to the threat of Golden Mussel. Staff will be available to answer any questions from the BOS or the public and facilitate any discussion.
2) WRD staff are requesting approval of funds to be allocated to golden mussel prevention programming, in an amount not to exceed $25,000 for the remainder FY 2024-25.
It is anticipated an additional request for funds in the amount of $245,000 will be presented during FY 2025-26 Budget Hearings.
These funds will provide valuable resources and capacity to maintain and improve invasive mussel prevention efforts in Lake County, during a time when alternative state or federal sources are not available. WRD staff will continue to seek funding, as applicable, to sustain the Golden Mussel prevention program.
Recommended Action
a) Presentation only, no action required.
b) Approve funding request to support Fiscal Year 2024-25 Golden Mussel prevention activities for Lake County in an amount not-to exceed $25,000.
a) Presentation Only.
b) On motion of Supervisor Rasmussen, and by vote of the Board, Approved funding request to support Fiscal Year 2024-25 Golden Mussel prevention activities for Lake County in the amount of $25,000. The motion carried by the following vote:
Ayes- Supervisors: 4 - Sabatier, Rasmussen, Pyska, and Crandell
Absent- Supervisor: 1 - Owen
Clerk’s notes: Invasive Species Program Coordinator Angela DePalma-Dow presented a PowerPoint Presentation to the Board.
Chair Crandell asked if anyone present wished to speak. No one wished to speak and the public input portion of this item was closed.
7. Non-Timed Items
7.1Supervisors’ weekly calendar, travel and reports
7.2Consideration of the following Advisory Board appointments:
Big Valley Advisory Council
Appointment
Motion carried
Carried 4-0 — moved by Rasmussen
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Crandell: aye Owen: absent Pyska: aye Rasmussen: aye Sabatier: aye
Staff memo
Executive Summary
(include fiscal and staffing impact narrative):
The following Advisory Boards and Commissions have vacancies as of January 1, 2025, and applications for consideration have been received.
Big Valley Advisory Council
Two (2) Vacancies: One (1) Public Member, One (1) Public Member - Alternate
Sydney Gilberson, New Applicant
Margaux Kambara, New Applicant
Recommended Action
Appoint qualified applicants to the specified advisory board.
On motion of Supervisor Rasmussen, and by vote of the Board, appointed Sydney Gilberson to the alternate seat of the Big Valley Advisory Council. The motion carried by the following vote:
Ayes- Supervisors: 4 - Sabatier, Rasmussen, Pyska, and Crandell
Absent- Supervisor: 1 - Owen
Clerk’s notes: Supervisor Rasmussen introduced the item to the Board.
Chair Crandell asked if anyone present wished to speak. No one wished to speak and the public input portion of this item was closed.
7.3Consideration of Presentation of 2024 Housing Element and General Plan Annual Progress Reports
Report
Staff memo
Executive Summary
The Community Development Department (CDD) will provide a review of the 2024 Housing Element and General Plan Annual Progress Reports (APRs) to the Board of Supervisors. Both APRs will be submitted to the Department of California Housing and Community Development (HCD) and the Governor's Office of Planning and Research prior to the April 1, 2025, deadline.
Since 1969, California has required that all local governments (cities and counties) adequately plan to meet the housing needs of everyone in the community. California's local governments meet this requirement by adopting housing plans (aka housing elements) as part of their "general plan" (also required by the state). General plans serve as the local government's "blueprint" for how the city and/or county will grow and develop and include eight elements: land use, transportation, conservation, noise, open space, safety, environmental justice, and housing.
All jurisdictions are required to provide OPR and the HCD with separate and Housing Element and General Plan Annual Progress Reports APRs by April 1 each year (covering the previous calendar year), pursuant to Government Code Sections 65400 and 65700. Attachment 1 includes the 2024 Housing Element APR and Attachment 2 includes the 2024 General Plan APR.
Each jurisdiction (counties and cities) must prepare an Annual Progress Report (APR) on the jurisdiction's status and progress in implementing its housing element using forms and definitions adopted by the California Department of HCD (Government Code Section 65400).
Housing Element APR Summary
The 2024 Housing Element APR consists of a spreadsheet template created by the HCD to capture housing activity and the County of Lake's progress toward meeting it's Regional Housing Needs Allocation (RHNA). The Housing Element APR report includes the following topics. Topics that do not apply to the County are left blank (Table J and Table K):
* Table A - Housing Development Applications Submitted
* Table A2 - Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units
* Table B - Regional Housing Needs Allocation Progress - Permitted Units Issued By Affordability
* Table C - Sites Identified or Rezoned to Accommodate Shortfall Housing Need
* Table D - Program Implementation Status Pursuant to Government Code Section 65583
* Table E - Commercial Development Bonus Approved Pursuant to Government Code Section 65915.7
* Table F - Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites Pursuant to Government Code Section 65583.1, subdivision (c)
* Table F2 - Units Converted Pursuant to Government Code Section 65400.2
* Table G - Locally Owned Lands Included in the Housing Element Sites Inventory, that have been sold, leased, or otherwise disposed of, Pursuant to Government Code Section 65400.1
* Table H - Locally Owned or Controlled Lands Declared Surplus Pursuant to Government Code Section 54221, or Identified as Excess Pursuant to Government Code Section 50569
* Table J - Student Housing Development with a Density Bonus Approved Pursuant to Government Code section 65915(b)(1)(F)
* Table K - Tenant Preference Policy Adopted Pursuant to Government Code Section 7061 Local Early Action Planning (LEAP) Grant Reporting
The table below lists the 2024 totals that were issued by the CDD for entitlements, building permits, and certificates of occupancy. As shown, of the 123 entitlements issued, there were 27 very low units and 27 low non-deed restricted units. A total of 91 building permits were issued, including 12 low deed restricted units. A total of 26 certificates of occupancy were issued, including five very low non-deed restricted units.
2024 Entitlements, Building permits, and Certificates of Occupancy
Completed Entitlement Issued by Affordability Summary
Income Level
Current Year
Very Low
Deed Restricted
0
Non-Deed Restricted
27
Low
Deed Restricted
0
Non-Deed Restricted
27
Moderate
Deed Restricted
0
Non-Deed Restricted
34
Above Moderate
35
Total Units
123
Building Permits Issued by Affordability Summary
Income Level
Current Year
Very Low
Deed Restricted
0
Non-Deed Restricted
16
Low
Deed Restricted
12
Non-Deed Restricted
12
Moderate
Deed Restricted
0
Non-Deed Restricted
14
Above Moderate
37
Total Units
91
Certificate of Occupancy Issued by Affordability Summary
Income Level
Current Year
Very Low
Deed Restricted
0
Non-Deed Restricted
5
Low
Deed Restricted
0
Non-Deed Restricted
1
Moderate
Deed Restricted
0
Non-Deed Restricted
5
Above Moderate
15
Total Units
26
Source: Lake County, 2025. Accela Permitting Database.
Note: Data is from the Annual Element Progress Report Excel Spreadsheet.
According to the Housing Element ARP, the total RHNA needed to meet the County's allocated total units from the State for the sixth-cycle period from 2019 through 2027. The total RHNA is 1,339, and from 2019 to 2024, a total of 369 units have been met. By income level only 21 units have been met for very low non-deed restricted. Only 6 extremely low-income units have been met. In order to meet the required RHNA, the County will need to issue permits for 1,130 units which would include 160 units for extremely low-income levels.
General Plan ARP Summary
The 2024 General Plan APR gives an overview of how the County implemented its 2008 General Plan through various actions. A description of each Element is provided followed by the actions that implement the Plan. In addition to the 2008 General Plan, an overview of activities in preparation of the Lake County 2050 General Plan update is also provided.
Although General Plan APR's have been required by the HCD since 2019, the first was not completed until last year. The HCD has no template for the General Plan ARP, but requires topics to include.
Attachments
1. 2024 Housing Element Annual Progress Report
2. 2024 General Plan Annual Progress Report
Recommended Action
This item is informational only. No action requested.
Presentation Only.
Clerk’s notes: Community Development Director Mireya Turner introduced the item to the Board. Senior Planner Laura Hall presented the item to the Board.
Chair Crandell asked if anyone present wished to speak. No one wished to speak and the public input portion of this item was closed.
8. Closed Session
8.13:00 P.M. - Public Employee Evaluation:
Title: Public Health Officer
Closed Session Item
8.2Public Employee Evaluation:
Title: County Counsel
Closed Session Item
Clerk’s notes: This item was pulled and continued to a future date.
8.3Public Employee Evaluation:
Title: Air Pollution Control Director
Closed Session Item
Clerk’s notes: This item was pulled and continued to a future date.
8.4Conference with Labor Negotiator: (a) Chief Negotiator: C. Torrez; County Negotiators: S. Parker, S. Carter, C. Moreno, P. Samac and D. Rico; and (b) Employee Organizations: LCDDAA, LCDSA, LCCOA, LCEA, LCSEA and LCSMA
Closed Session Item
Clerk’s notes: This item was pulled and continued to a future date.