Lake County Meetingsinteractive archive

Planning Commission — Thursday, January 11, 2024

9:00 AM · Board Chambers

How to attend or watch

Meetings of the Lake County Planning Commission will be available for participation virtually via Zoom. Live video of all Planning Commission meetings are broadcast on Lake County PEG TV (TV8) , and online, at : https://countyoflake.legistar.com/Calendar.aspx
Please click this URL to join. https://lakecounty.zoom.us/j/83447170315?pwd=eHZYSER1Y3pTdHJ2K3h6Mi9DbnBiZz09 Passcode: 986758 Or One tap mobile: +16699006833,,83447170315#,,,,*986758# US (San Jose) +16694449171,,83447170315#,,,,*986758# US Or join by phone: Dial(for higher quality, dial a number based on your current location): US: +1 669 900 6833 or +1 669 444 9171 or +1 253 215 8782 or +1 346 248 7799 or +1 719 359 4580 or +1 253 205 0468 or +1 646 931 3860 or +1 689 278 1000 or +1 929 205 6099 or +1 301 715 8592 or +1 305 224 1968 or +1 309 205 3325 or +1 312 626 6799 or +1 360 209 5623 or +1 386 347 5053 or +1 507 473 4847 or +1 564 217 2000 Webinar ID: 834 4717 0315 Passcode: 986758
To submit a written comment on any agenda item please visit: https://countyoflake.legistar.com/Calendar.aspx and click on the eComment feature linked to the meeting date.
1.9:00 AM - Call To Order
2.Pledge of Allegiance
3.Verification of Legal Notice
4.Consent Agenda
4a.Approve Minutes from December 14, 2023, Planning Commission Meeting Minutes
5.Public Input
6.Timed Items - Public Hearings
6a.PUBLIC HEARING - Presentation from County Counsel regarding Policies regarding Gratuities Public Hearing
6b.PUBLIC HEARING - Consideration of proposed Major Use Permit (UP 20-71), and Mitigated Negative Declaration (IS 20-86), for Cultivation of 130,680-sf of Outdoor Cannabis Canopy; 36,000-sf of Greenhouse Commercial Cannabis Canopy; and one Distributor Transport Only, Self-Distribution License; Applicant: Cruz Family Farms LLC; Located: 8300 Old Dirt Road, Kelseyville (APN: 007-023-05) Public Hearing
6c.PUBLIC HEARING - Consideration of proposed Major Use Permit (UP 20-40), and Mitigated Negative Declaration (IS 20-50), for cultivation of 22,000-sf of cannabis canopy inside eight greenhouses within a fenced 47,040-sf enclosure; and one Type 13 Cannabis Distributor Transport Only, Self-Distributor License; Applicant: Higher Ground Farms/John Oliver; Located: 3545 Finley East Road, Kelseyville (APN: 008-026-07) Public Hearing
Staff memo

Date: January 11, 2024 · From: Mireya G. Turner, Director Michelle Irace, Principal Planner Prepared by Eric Porter, Associate Planner

Executive Summary

This application is requesting one A-Type 3B mixed-light commercial cannabis cultivation license for 22,000 sf of cannabis canopy within eight 30' x 96' greenhouses; two 30' x 96' greenhouses for immature plants; one 48' x 100' building for cannabis processing and drying, and a Type 13 Distributor Transport Only, Self-distribution License. The project includes site improvements with the following: 6' tall screening/ security fence, security system, employee parking, a 10' x 10' restroom, and improvements to the interior driveway to make it compliant with Public Resource Codes (PRC) 4290 and 4291. The applicant is proposing to have two 5,000-gallon water tanks on site for irrigation. Water will be provided from an existing permitted on-site groundwater well. The applicant indicates that there will be four full-time employees, and up to 16 seasonal employees during peak harvest season. Construction is anticipated to last up to three months and would occur Monday through Saturday from 8 a.m. to 5 p.m. Site work includes building 10 greenhouses, building the 48' x 100' processing / drying building, fence installation and improving the interior driveway to meet PRC 4290 and 4291 commercial driveway standards. Average vehicle trips during construction are estimated to be eight to sixteen daily trips, with up to 1,152 total projected construction trips UP 20-40 Higher Ground - IS 20-50 anticipated (assuming 16 daily trips, six days / week, 12 weeks of construction). Operations would consist of four employees during regular operations, and up to 16 employees during peak harvest season. Operations would occur Monday through Sunday, 7 a.m. to 7 p.m. Total projected trip count would be about 112 weekly trips during non-harvest times and about 448 weekly trips during peak harvest season.

Recommended Action

Staff recommends the Planning Commission take the following actions: Adopt Initial Study (IS 20-50) for Major Use Permit (UP 20-40) with the following findings: 1. Potential impacts to Aesthetics can be mitigated to 'less than significant' levels with the inclusion of mitigation measures AES-1 through AES-3. 1. Potential environmental impacts related to Air Quality can be mitigated to less than significant levels by mitigation measures AQ-1 through AQ-7 1. Potential environmental impacts related to Biological Resources can be mitigated to less than significant levels by mitigation measures BIO-1 and BIO-2. 1. Potential environmental impacts related to Cultural and Tribal Resources can be mitigated to less than significant levels by mitigation measures CUL-1 through CUL-3. 1. Potential environmental impacts regarding Geology and Soils can be mitigated to less than significant levels with the inclusion of mitigation measure CUL-3. 1. Potential environmental impacts related to noise can be mitigated to less than significant levels by mitigation measures NOI-1 and NOI-2. 1. This project is consistent with other agricultural land uses in the vicinity. 1. This project is consistent with the Lake County General Plan, Kelseyville Area Plan and Lake County Zoning Ordinance. B. Approve Major Use Permit (UP 20-40) with the following findings: 1. That the establishment, maintenance, or operation of the use applied for will not under the circumstances of the particular case, be detrimental to the health, safety, morals, comfort and general welfare of the persons residing or working in the neighborhood of such proposed use or be detrimental to property and improvements in the neighborhood or the general welfare of the County. 1. That the site for the project is adequate in size, shape, location, and physical characteristics to accommodate the type of use and level of development proposed. 1. That the streets, highways and pedestrian facilities are reasonably adequate to safely accommodate the specific proposed use with mitigation measure added. 1. That there are adequate public or private services, including but not limited to fire protection, water supply, sewage disposal, and police protection to serve the project. 1. That the project is in conformance with the applicable provisions and policies of this Code, the Lake County General Plan, the Kelseyville Area Plan and the Lake County Zoning Ordinance. 1. That no violation of Chapters 5, 17, 21, 23 or 26 of the Lake County Code currently exists on the property, unless the purpose of the permit is to correct the violation, or the permit UP 20-40 Higher Ground - IS 20-50 1. to a portion of the property which is sufficiently separate and apart from the portion of the property in violation so as not to be affected by the violation from a public health, safety or general welfare basis. 2. The proposed use complies with all development standards described in Chapter 21, Article 27, Section 1.i. 1. The applicant is qualified to make the application described in Chapter 21, Article 27, Section 1.ii.(g). 1. The application complies with the qualifications for a permit described in Chapter 21, Article 27, Section 1.ii.(i).
7.Non-Timed Items
7a.Election of Chair and Vice Chair of the Lake County Planning Commission Action Item
8.Department Update
9.Adjournment